  "name": "What factors influence the cost of a site-feasibility assessment?",
  "description": "Costs depend on parcel size, topography, and whether additional technical work like boundary surveys or geotechnical soil testing is required.",
  "url": "https://totalbuildingsystems.net/faq/what-factors-influence-the-cost-of-a-site-feasibility-assessment",
  "mainEntity": [
    {
      "@type": "Question",
      "name": "What factors influence the cost of a site-feasibility assessment?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "The overall cost depends on parcel size, terrain complexity, and whether specialty tests like soil perc testing or formal land surveys are required. A basic visual review and regulatory check by a general contractor requires far less investment than full pre-construction engineering. If deep bedrock, steep slopes, or unverified utility easements require geotechnical borings or boundary surveys, those third-party fees are factored in separately. Investing in this preliminary evaluation often saves tens of thousands of dollars by uncovering hidden site prep expenses before contracts are locked in.",
        "description": "Costs depend on parcel size, topography, and whether additional technical work like boundary surveys or geotechnical soil testing is required."
      }
    }
  ],